Refine your search:     
Report No.
 - 
Search Results: Records 1-5 displayed on this page of 5
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Prototype fast breeder reactor Monju; Its history and achievements

Tsuruga Comprehensive Research and Development Center

JAEA-Technology 2019-007, 159 Pages, 2019/07

JAEA-Technology-2019-007.pdf:19.09MB
JAEA-Technology-2019-007-high-resolution1.pdf:42.36MB
JAEA-Technology-2019-007-high-resolution2.pdf:33.56MB
JAEA-Technology-2019-007-high-resolution3.pdf:38.14MB
JAEA-Technology-2019-007-high-resolution4.pdf:48.82MB
JAEA-Technology-2019-007-high-resolution5.pdf:37.61MB

This report summarizes the history and achievements of the prototype fast breeder reactor Monju. The development of Monju started in 1968 as a prototype reactor following the experimental fast reactor Joyo. The development covers all the activity related to the fast reactor; plant design, mockup tests, construction, operation, and plant management. This report summarizes the history and achievements for 11 technical areas: history and principal achievements, design and construction, operation test, plant safety, core physics, fuel, plant system, sodium technology, materials and mechanical design, plant management, and trouble management.

JAEA Reports

Annual report of Department of Research Reactor and Tandem Accelerator, JFY2015; Operation, utilization and technical development of JRR-3, JRR-4, NSRR, Tandem Accelerator and RI Production Facility

Department of Research Reactor and Tandem Accelerator

JAEA-Review 2017-027, 142 Pages, 2018/01

JAEA-Review-2017-027.pdf:5.75MB

The Department of Research Reactor and Tandem Accelerator is in charge of the operation, utilization and technical development of JRR-3 (Japan Research Reactor No.3), JRR-4 (Japan Research Reactor No.4), NSRR (Nuclear Safety Research Reactor), Tandem Accelerator and RI Production Facility. This annual report describes the activities of our department in fiscal year of 2015.

JAEA Reports

Annual report of JMTR, No.15, FY2000; April 1, 2000 to March 31, 2001

Department of JMTR

JAERI-Review 2002-001, 86 Pages, 2002/02

JAERI-Review-2002-001.pdf:7.18MB

During the FY2000 (April 2000 to March 2001), the JMTR (Japan Materials Testing Reactor) was operated in 6 operation cycles (130 days) for irradiation studies on the IASCC of the LWR materials, development of actinide contained uranium-hydride fuels, development of fusion blanket materials, and so on. The total number of capsules and hydraulic rabbits irradiated were 132 and 79, respectively.Technology development programs were conducted in the following fields. As concerning to the utilization of JMTR, a irradiation facility for the IASCC studies, irradiation capsules for RPV surveillance specimen and automatic temperature control system for irradiation capsules were developed.New efficient production process was developed for pebble type tritium breeder material for fusion reactor blanket, and tritium generation/recovery behavior under irradiation was investigated using pebble packed test piece.This report summarizes these activities performed in the department of JMTR during the FY2000.

JAEA Reports

Development of JOYO plant operation management expert Tool (JOYPET)

; Terano, Toshihiro; ; ; Okubo, Toshiyuki

JNC TN9410 2000-004, 30 Pages, 2000/03

JNC-TN9410-2000-004.pdf:0.86MB

The Operation and Maintenance Support Systems for JOYO are being developed, with the aim of ensuring the stable and safe operation of JOYO and improving operational reliability of future FBR plants. Plant Operation Management Expert Tool named JOYPET had been developed as one of the Operation and Maintenance Support Systems, which helps plant operation management. The following functions were developed and applied. (1)Papers management (Plant status management) function for maintenance activities (2)Isolation management support function for plant operation (3)Automatically drawing function of plant operation schedule (4)Isolation judgment function for plant operation By use this system, the plant management of JOYO was able to improved reliability and reduced manpower.

JAEA Reports

5 (Records 1-5 displayed on this page)
  • 1